An Integrated Project Funded by the European Commission under the Sustainable Development, Global Change and Ecosystems Thematic Priority Area.
FP6 LogoEU Logo
Contract Number: 018320
Project Cordinator: Dr. Theo van den Hoven KIWA Water Research
Project Duration: 1st January 2006 to 31st December 2010

Workarea 7 - Integrate, Validate & Demonstrate

Deliverable

Title

D 7.3.3

CASE STUDY 1
Windhoek, multi-barrier approach to the reclamation of wastewater to produce drinking water

D 7.4.1

CASE STUDY 2
Report on the characterization of the Lisbon drinking water distribution network

D 7.5.1

CASE STUDY 3
Report of the end-user workshop with Riga Water

D 7.5.3

Risk Assessment of Riga Water Supply

D 7.5.4

Risk reduction in the Riga water supply by application of modeling tools, pathogen control and turbidity reduction

D 7.5.5

Final Report of the Riga Case Study

D 7.5.6

Cost benefit analysis of water quality improvement in Riga water distribution

D 7.5.7

Consumer Issues in Riga
A Case Study
Executive Summary

D 7.9.2

Design and applicability of the OBM process for New Delhi
Executive Summary

D 7.9.5

Endocrine disruptors and algal toxins during Riverbank Filtration passage in northern India
Executive Summary